Concrete Block Lintel SWMS
The block work method statement for concrete lintel installation identifies hazards and risks with how to install a lintel in a block wall and assists with implementing safe working practices for installing a lintel in a block wall.
Safe Work Method Statement
Blockwork Lintel SWMS
SWMS Safe work method statement for lintel construction:
Provides critical WHS information and safety instructions for workers to construct a blockwork lintel without risk to health and safety
Ensures workers can identify hazards and manage risks involved with installing a lintel in a block wall
Provides workers with information, instruction, and training for constructing a concrete block lintel
SWMS Blockwork Lintel
SWMS document for concrete blockwork lintels focuses on hazard identification, risk assessment and control procedures per best practice guidelines for how to write a SWMS.
Blocklaying safety for how to install a lintel in a block wall per a block laying risk assessment
Concrete Block Lintel SWMS Content
SWMS are specific to a process with the SWMS content of the concrete block lintel SWMS addressing the health and safety issues relating to:
WHS Consultation
Risk assessment of workplace
Health and safety planning
Environmental hazards in the workplace
Implementation of controls for lintel construction
Health and safety information for employees
Pre start inspection for equipment used in the construction of a concrete block lintel
Working near overhead power lines
Electrical spotter to ensure safety near electrical installations
Lay concrete lintel blocks per blockwork wall construction details
Handling and fitting steel rebar to concrete block lintel
Temporary propping of lintel
Dismantle propping supporting blockwork lintel
Silica dust exposure
Working at height
Managing risks of hazardous chemicals in the workplace
Hazardous manual handling tasks
PPE requirements for concrete block lintel construction
Health and safety training for workers
Workplace housekeeping
Legislative and regulatory requirements
Monitoring compliance in the workplace
Includes risk matrix table
WHS Reporting Requirements
WHS Record keeping and reporting obligations for compliance with WHS legislative requirements for a SWMS require a person conducting a business or undertaking PCBU to maintain WHS records.
A PCBU must retain health and safety records for a concrete block lintel SWMS would include:
Risk assessment form template to record unidentified hazards, potential risks and specific control measures
Change control management form for the communication of controls to be implemented for identified hazards
SWMS Sign off sheet for high risk construction work activity to which the safe work method statement relates
Ready to Use Concrete Block Lintel SWMS
Save time and money with the SWMS template for lintel construction.
SWMS Compliance with Legislative and Regulatory Requirements is simple
We embed the business details and logo you supply in the safe work method statement for ensuring compliance with health and safety legislation
We email you the ready to use safe work method statement SWMS
All you have to do is
Complete the principal contractor details or PCBU details
Specify the workplace address to which the SWMS relates
Nominate your contact person
Complete WHS/OHS forms used in the workplace, e.g. risk assessment form
Safety Toolbox Talks
A method statement for blockwork lintel construction makes for an excellent toolbox talk topic at a blockwork toolbox talk

