Safe work method statement - Grader - Pre-operational inspection

1 of 14

Pre-operational inspection of grader

The purpose of conducting a pre-operational inspection of a grader is to assess for potential hazards generated as a result of operating the grader in the performance of a task. The inspection would include but not be limited to:

  • Safety mechanisms/equipment including FOPS and ROPS structures, boom restraining devices.
  • Air, hydraulic, exhaust and fuel system leaks.
  • Electrical systems.
  • Service and emergency brakes.
  • Etc.

Hazards and risks

Hazards associated with the conduct of a pre-operational inspection of a grader in the performance of a task would include but not be limited to:

  • Failure of hydraulic systems or components where not included as part of the pre-operational inspection.
  • Structural damage to grader where lift arms,blades, rippers and scarifiers are not inspected as part of the pre-operational inspection.
  • Failure to undertake regular greasing of a graders grease points may result in mechanical damage and failure of plant.
  • Refueling operations of a grader whilst it is operational shall result in death or serious injury.
  • Etc.

pixelpixel
Safety procedure includes

Grader - Pre-operational inspection safe work method statement

Grader - Pre-operational inspection safe work method statement is a 14 page document compliant with statute OHS reporting requirements. It identifies known hazards and risks, and outlines the control measures to be implemented to eliminate or minimise the risk of death, injury or illness generated as a result of undertaking the pre-operational inspection of a grader.
more


$125.00
inc GST

Control measures

Control measures to eliminate or minimise the risk of death, injury or illness to persons are addressed in the safe work method statement as per the following sections.

  • Consultation with employees.
  • Failure to conduct pre-operational inspection.
  • Failure to inspect functional operations of grader.
  • Preventative maintenance and refueling of grader.
  • Accessing cabin and grader areas.
  • Personal protective equipment requirements.
  • Training requirements.
  • Housekeeping requirements.
  • Failure to monitor controls.
  • Risk matrix and descriptors.
  • Additional hazards, risks and controls form.
  • Approval and change management form.
  • Sign-off form - Pre-operational inspection of grader.

Return to grader

Return to earthmoving plant

Return to plant and equipment

Return to safe work method statements

pixel
pixel

Mini Cart

Click the checkout button to continue
pixel


pixel
pixel
  Login  |  Site Credits