 Work at heights - Work platform supported by trestle ladders safe work method statement/job safety analysis  

Work platform supported by trestle ladders

A work platform supported by trestle ladders shall only be used to undertake light work tasks at a height, where other means of height access equipment (e.g. elevated work platform) is not available or not practicable to use given the circumstances.

  • Trestle ladders shall be high enough that a working platform is not less than 900 mm from the top.

Tasks

Tasks associated with setting up trestle ladders to support a work platform for the undertaking of a light work task at a height would include:
  • Determine compliance of trestle ladders to be used to support a work platform in the performance a light work task;
  • Carrying of equipment or materials when climbing a trestle ladder;
  • Inspection of work area, trestle ladders, work platform and edge protection for potential hazards;
  • Set-up of trestle ladders, work platform and edge protection for gaining access to undertake light work at a height;
  • Use of a work platform supported by trestle ladders to gain access to a height for the purpose of performing light work tasks;
  • Conduct a hazard identification of the immediate work area;
  • Assess risk to persons setting up trestle ladders to support a work platform for the purpose of gaining access to a height.

Online SWMS/JSA safe work method statement subscription service

WHS compliance has never been easier with your safe work method statement or job safety analysis prepared by ex WHS Qld Government Workplace Health and Safety Inspectorate in consultation with Industry OHS Representatives to comply with Work Health and Safety Legislation, Codes of Practice, Industry Standards and Australian Standards.

As a subscriber to a WHS online safe work method statement SWMS or job safety analysis JSA you and your employees can:

  • Access and view the work method statement, swms or jsa real time from any web capable device e.g. mobile phone, tablet, laptop, etc (for best results we recommend using the web browser Safari); and
  • Print the safe work method statement, swms or jsa sign off sheet and approval form including change management approval in a pdf format or hard-copy via the print option; and
  • Email the safe work method statement, swms or jsa notification advising a principal contractor, PCBU's and workers as to any specific controls to be implemented at a workplace for which the swms or jsa relates to; and
  • Never worry again about amendments, updates and versions; and
  • WHS maintain one controlled version of the safe work method statement or job safety analysis online as part of our continual improvement process; and
  • That means there can be no confusion as you and your employees are all using the same safe work method statement, swms or jsa at the same time, leaving you to concentrate on your business.

How do you access and implement the safe work method statement or job safety analysis?

To get you online, working, implementing and demonstrating safety compliance management, it's as easy as:

  • Log in via a mobile phone using your username and password;
  • Complete and email the safe work method statement, swms or jsa notification with user access to a principal contractor, PCBU's and workers for a specific workplace; and
  • That's it unless you need to print the sign off sheet, hazard and risk controls or change management approval form.

pixel** Error with tag {Insert Work-at-heights-Platform-trestle-ladders-ecommerce}: Page with code 'Work-at-heights-Platform-trestle-ladders-ecommerce' does not exist **

 Example Safe work method statement / job safety analysis for using a work platform supported by trestle ladders  

The sample safe work method statement is an extract of the first two identified health and safety hazards for the use of a work platform supported by trestle ladders.

  • The business logo and administrative details you provide at time of purchase shall replace those that you see in the sample safe work method statement/job safety analysis.

pixel pixel

 Work at heights - Work platform supported by trestle ladders safe work method statement  

 Hazard  
 Risk/outcome  
 Control measures  
 Implementation of controls  
Consultation not undertaken with workers as to the set-up and use of trestle ladders to support a work platform.Workers shall be exposed to risk of death or serious injury where the method of setting up and using trestle ladders to support a work platform for the purpose of gaining access to a height is performed or undertaken incorrectly.

Sustainable injuries would include but not be limited to:

  • First aid medical treatment for cuts and abrasions;
  • Falls from heights resulting in multiple fractures;
  • Crushing injuries;
  • Musculoskeletal injuries; and
  • Permanent disability.

The method of setting up and using trestle ladders to support a work platform for the purpose of gaining access to a height shall be undertaken in accordance with any manufacturers instruction and any instructions provided by Electrical Plumbing Group .Electrical Plumbing Group has a duty to ensure the health and safety of themselves, workers and other persons.
  • Workers setting up and using trestle ladders to support a work platform for the purpose of gaining access to a height shall be provided information, instruction, training and supervision as to the correct method of inspecting, setting up and using trestle ladders to undertake light work.

Light work
  • Light work means work that is light having regard to:
  • Amount of physical exertion involved;
  • Physical capacity of a worker doing the work;
  • Range of movement involved;
  • Weight or bulk of materials or equipment involved.
  • Use of a medium or heavy-duty angle grinder whilst working from a working platform is not classified as light work. Light work would typically include but not be limited to:
  • Painting;
  • Installing bolts to connections, etc;
  • Performing inspections or tests.

Consultation

Consultation shall occur between line management, workers and health and safety representatives as to the method of setting up and using trestle ladders to support a work platform for the purpose of gaining access to a height.

The process of consultation shall assess the hazards generated as a result of setting up and using trestle ladders to support a work platform and take into consideration:

  • Height of the task and whether it is defined as light work;
  • Could an alternative means of access or height access equipment be used with less risk to the user;
  • Selection of the correct trestle ladders e.g. type, size, etc dependant upon height and task to be performed;
  • Inspection of trestle ladders and work platform to assess condition and usability of the trestle ladders and work platform;
  • Is the user likely to side load a trestle ladder or overreach;
  • Can a user maintain 3 points of contact when climbing a single or trestle ladder;
  • Is the user required to carry materials when climbing a trestle ladder to access a working platform;
  • Inspection and set-up of trestle ladders supporting a working platform to determine its condition;
  • Erection of working platform to trestle ladder, and edge protection where the height of the work platform is 2 metres above the ground surface;
  • Movement and shifting of trestle ladders due to ground surface e.g. slope, compactness;
  • Method and means by which trestle ladders shall be secured or restrained to prevent movement;
  • Environmental hazards and risks to workers e.g. steel starter bars;
  • Working at heights, prevention of tools and materials falling;
  • Are persons at risk of injury when setting up and using trestle ladders to support a work platform?

Electrical Plumbing Group shall make a prepared for the set-up of trestle ladders to support a working platform available for perusal by workers.

Residual risk

Following the implementation of controls the risk should reduce to:

 Hazard  
 Risk/outcome  
 Control measures  
 Implementation of controls  
Introduction of hazards generated from the set-up and use of trestle ladders to support a work platform as a result of implementing proposed control measures. Workers shall be exposed to risk of death or serious injury where hazards are created as a result of implementing proposed control measures.

Sustainable injuries would include but not be limited to:

  • First aid medical treatment for cuts and abrasions;
  • Falls from heights resulting in multiple fractures;
  • Crushing injuries;
  • Musculoskeletal injuries; and
  • Permanent disability.
Control measures as per the hierarchy of controls shall be developed and implemented where additional hazards are generated from the set-up and use of trestle ladders to support a work platform.
Electrical Plumbing Group shall ensure hazards generated from the set-up and use of trestle ladders to support a work platform are identified with the hazard controlled.

Control measures

To prevent risk of death or serious injury to workers and other persons, the person with management or control of the works shall ensure:

  • The risk of death or serious injury resulting due to the conduct of the task is assessed to determine a persons exposure;
  • Control measures to eliminate or minimise the risk of death or serious injury to persons shall be developed in consultation with workers;
  • Control measures as per the hierarchy of controls shall be implemented to prevent, or minimise a persons level of exposure to risk of death or serious injury;
  • Workers undertaking the set-up and use of trestle ladders to support a work platform shall be trained as to any new control/s to be implemented and informed as to the hazard notification process should additional hazards be identified.

Residual risk

Following the implementation of controls the risk should reduce to:

 Additional hazards and risks with using a work platform supported by trestle ladders  

Additional hazards and risks identified with the use of a work platform supported by trestle ladders for which control measures have been developed as per the risk identification process include:

  • Non-compliant trestle ladders supporting a work platform at a height.
  • Carrying of equipment or materials when climbing a trestle ladder to access a work platform.
  • Failure to inspect a trestle ladder and work area for potential hazards.
  • Alteration or modification of a trestle ladder intended to support a work platform.
  • Setting up trestle ladders to support a working platform.
  • Work platform supported by trestle ladders.
  • Exposed edge of a work platform.
  • Using a trestle ladder to gain access to a work platform at a height for the purpose of performing light work tasks.
  • Handling and set-up of a work platform supported by trestle ladders.
  • Workers not provided with the required personal protective equipment and having not received instruction as to method by which to wear an article of PPE.
  • Training not provided to workers in the set-up and use of a work platform supported by trestle ladders.
  • Housekeeping of a workplace not undertaken and/or no areas assigned for the storage of materials and plant.
  • Workers not advised of specific controls to be implemented to ensure compliance with Work Health and Safety Legislation, Codes of Practice and Standards.
  • Performance of tasks and activities undertaken in connection with the set-up and use of a work platform supported by trestle ladders.
  • Failure to monitor the implementation of control measures.

How do you keep employees and clients current and up to date?

Simple each user be they an employee, contractor or client is assigned a unique username and password to access the controlled version for the use of a work platform supported by trestle ladders jsa/swms online.

  • Each user can access and view the online swms/jsa from a web capable device e.g. mobile phone with their username and password.
  • Line management personnel can access and print the safe work method statement/job safety analysis and online jsa/swms forms.
  • Line management personnel can send an swms/jsa email notification to a principal contractor, pcbu's and workers advising as to the details of the workplace, principal contractor, commencement and completion dates, person with management or control and any specific controls to be implemented when using a work platform supported by trestle ladders.
  • Users are notified of an amendment to the job safety analysis/work method statement via the online ohs diary and email notification.

What we will do to get you online

As a WHS online safe work method statement or job safety analysis subscriber WHS shall:

  • Create a group user account for your business and assign the user access required by you and your employees.
  • Insert your company logo and business details throughout the online safe work method statement, swms or jsa for the purpose of work health and safety compliance.
  • Notify you if the work method statement or job safety analysis or it's safe operating procedures or methods are amended.

Ordering is simple

  1. Add the safe work method statement, job safety analysis or safe operating procedure and any additional swms's, jsa's or sop's you require to the shopping cart.

  2. Follow the checkout process, ensuring you attach your company logo in a high resolution JPEG format for inclusion in the online safe work method statement/job safety analysis.

  3. Complete your order and payment process. A Tax Invoice will be forwarded to the email address you provide.

What happens next?

Upon receipt of payment notification WHS shall:

  • Send you an email requesting any additional information we may require to create your group registration.
  • Within 2 hours, customise your online safe work method statement/job safety analysis to incorporate your company logo and relevant business details, and create the required subscriber user access and email details of usernames and passwords to you. Where our workload is excessive we reserve the right to extend this time frame to 24 hours.

100% Money back guarantee!!

If you find a more comprehensive online safe work method statement, job safety analysis, safe operating procedure, SWMS, JSA or SOP accessible online, able to be printed and offers an email notification service from any web capable device, and you provide evidence of such we will refund your purchase.

pixel
 Associated swms's/jsa's  

Shoppers who bought the use of a work platform supported by trestle ladders safe work method statement/job safety analysis also purchased.


Return to working at heights

Return to SWMS's/JSA's