pixel
pixelpixelpixel
pixelHome pagepixelpixelAbout uspixelpixelFAQpixelpixelContact uspixelpixelFollow workhealthsafe on Twitterpixelpixelpixelpixelpixel
pixel pixelpixel
pixel
pixel

 Thicknesser/planer safe work method statement/job safety analysis  

What is a thicknesser?

A thickness/planer is a static woodworking machine used to create boards of an even thickness throughout their length and flat on the upper surface.

A thickness/planer consists of three components:

  • A cutter head containing the cutting knives;
  • In feed and out feed rollers that draw the board through the machine; and
  • An adjustable table to control the thickness of the board.

Timber board is fed into a thicknesser/planer when it makes contact with the in feed roller; the board is gripped and drawn into the thicknesser and past the rotating cutter head.

When the timber board passes through the knives, the required amount of material is removed with the out feed rollers pulling the board through, and ejects it from the thicknessser/planer at the end of the pass.

Uses

Thicknesser/planers may be used in the performance of a work task to:
  • Reduce the thickness of a timber board;
  • Planning or edging the edge of a timber board.

Tasks

Tasks associated with the operation of a thicknesser would include:

  • Pre-operational inspection of a thicknesser to ensure plant is in good order, electrically safe and all guards, handles and safety mechanisms are fitted and operational;
  • Inspection of electrical cable to determine whether the cable and plug is in good order or needs replacing;
  • Connection of electrical extension lead to an approved safety switch. Testing of safety switch;
  • Inspection of cutting blades to determine whether the blades are in good order or need replacing;
  • Fitting and securing of cutting blades correctly to a thicknesser;
  • Removal and fitting of guard/s and handles associated with the body of the thicknesser;
  • Safe operation of thicknesser in the performance of a specific task;
  • Specific controls to be implemented when using a thicknesser in the performance of a task;
  • Hazardous manual tasks and ergonomic issues associated with the handling of materials and operation of thicknesser;
  • Selection of personal protective equipment (PPE);
  • Conduct a hazard identification of the task being performed;
  • Compliance with specific controls as per a work health and safety regulation, code of practice, standard;
  • Assess risk to workers undertaking the handling of materials and operation of a thicknesser.

Online SWMS/JSA safe work method statement subscription service

WHS compliance has never been easier with your safe work method statement or job safety analysis prepared by ex WHS Qld Government Workplace Health and Safety Inspectorate in consultation with Industry OHS Representatives to comply with Work Health and Safety Legislation, Codes of Practice, Industry Standards and Australian Standards.

As a subscriber to a WHS online safe work method statement SWMS or job safety analysis JSA you and your employees can:

  • Access and view the work method statement, swms or jsa real time from any web capable device e.g. mobile phone, tablet, laptop, etc (for best results we recommend using the web browser Safari); and
  • Print the safe work method statement, swms or jsa sign off sheet and approval form including change management approval in a pdf format or hard-copy via the print option; and
  • Email the safe work method statement, swms or jsa notification advising a principal contractor, PCBU's and workers as to any specific controls to be implemented at a workplace for which the swms or jsa relates to; and
  • Never worry again about amendments, updates and versions; and
  • WHS maintain one controlled version of the safe work method statement or job safety analysis online as part of our continual improvement process; and
  • That means there can be no confusion as you and your employees are all using the same safe work method statement, swms or jsa at the same time, leaving you to concentrate on your business.

How do you access and implement the safe work method statement or job safety analysis?

To get you online, working, implementing and demonstrating safety compliance management, it's as easy as:

  • Log in via a mobile phone using your username and password;
  • Complete and email the safe work method statement, swms or jsa notification with user access to a principal contractor, PCBU's and workers for a specific workplace; and
  • That's it unless you need to print the sign off sheet, hazard and risk controls or change management approval form.

pixel

 1 Year access - Online and print  

1-5 Users

1 Year online and print access to Thicknesser SWMS/JSA - 5 persons @ $25.00 per user.

more

Total: $125.00 inc GST

6-10 Users

1 Year online and print access to Thicknesser SWMS/JSA - 10 persons @ $15.00 per user.

more

Total: $150.00 inc GST

pixel
 Save up to 20% More  
pixel

Mini Cart

Click the checkout button to continue
pixel

 Example Safe work method statement / job safety analysis for using a thicknesser/planer  

The sample safe work method statement is an extract of the first two identified health and safety hazards for the operation and use of a thicknesser/planer.

  • The business logo and administrative details you provide at time of purchase shall replace those that you see in the sample safe work method statement/job safety analysis.

pixel pixel

 Using a thicknesser/planer safe work method statement  

 Hazard  
 Risk/outcome  
 Control measures  
 Implementation of controls  
Consultation not undertaken with workers as to the operation and use of a thicknesser.Workers shall be exposed to risk of death, serious injury or illness where the operation or use of a thicknesser is performed or undertaken incorrectly.

Sustainable injuries/illnesses would include but not be limited to:

  • First aid medical treatment for cuts and abrasions;
  • Electrocution;
  • Loss of limb;
  • Musculoskeletal injuries;
  • Respiratory disease;
  • Facial injuries; and
  • Permanent disability.

Damage to plant.

The operation and use of a thicknesser shall be undertaken in accordance with any manufacturers instruction and any instructions provided by Electrical Plumbing Group .Electrical Plumbing Group has a duty to ensure the health and safety of themselves, workers and other persons.
  • Workers operating a thicknesser shall be provided information, instruction, training and supervision as to the correct method by which a thicknesser shall be operated or used in the performance of a task.

Consultation

Consultation shall occur between line management, workers and health and safety representatives as to the safe method of operating and using a thicknesser.

The process of consultation shall assess the hazards generated from the operation of a thicknesser and take into consideration:

  • Is the operation of a thicknesser necessary;
  • Could an alternative tool be used with less risk to the user;
  • Selection of the correct cutting blades/knives e.g. type, size, etc dependant upon material to be cut;
  • Fitment of safety mechanisms to the thicknesser e.g. guards, deadman switch, fence;
  • Pre-operational inspection of thicknesser;
  • Environmental hazards and risks to workers;
  • Are workers at risk of serious injury when operating or using a thicknesser;
  • Hazardous manual tasks associated with handling materials and the operation of a thicknesser.

Electrical Plumbing Group shall make a prepared for the operation and use of a thicknesser available for perusal by workers.

Residual risk

Following the implementation of controls the risk should reduce to:

 Hazard  
 Risk/outcome  
 Control measures  
 Implementation of controls  
Introduction of hazards generated from the operation of a thicknesser as a result of implementing proposed control measures. Workers shall be exposed to risk of death, serious injury or illness where hazards are created as a result of implementing proposed control measures.

Sustainable injuries/illnesses would include but not be limited to:

  • First aid medical treatment for cuts and abrasions;
  • Electrocution;
  • Loss of limb;
  • Musculoskeletal injuries;
  • Skin penetrating injuries;
  • Respiratory disease;
  • Facial injuries; and
  • Permanent disability.

Damage to plant.

Control measures as per the hierarchy of controls shall be developed and implemented where additional hazards are generated from the operation of a thicknesser.
Electrical Plumbing Group shall ensure hazards generated as a result of operating a thicknesser are identified with the hazard controlled.

Control measures

To prevent risk of death, serious injury or illness to workers and other persons, the person with management or control of the works shall ensure:

  • The risk of death, serious injury or illness resulting due to the conduct of the task is assessed to determine a persons exposure;
  • Control measures to eliminate or minimise the risk of death, serious injury or illness to persons shall be developed in consultation with workers;
  • Control measures as per the hierarchy of controls shall be implemented to prevent, or minimise a persons level of exposure to risk of death, serious injury or illness;
  • Workers undertaking the performance of a task requiring the operation of a thicknesser shall be trained as to any new control/s to be implemented and informed as to the hazard notification process should additional hazards be identified.

Residual risk

Following the implementation of controls the risk should reduce to:

 Additional hazards and risks with operating and using a thicknesser/planer  

Additional hazards and risks identified with the operation and use of a thicknesser/planer for which control measures have been developed as per the risk identification process include:

  • Working with faulty, defective or non-compliant plant.
  • Incompatible cutting blade fitted to thicknesser/planer.
  • Guards not fitted or installed to thicknesser/planer.
  • Alteration or modification of thicknesser/planer.
  • Operation of thicknesser/planer without conducting a pre-operational inspection.
  • Operation of thicknesser/planer in performance of a work task.
  • Hazardous chemicals and products associated with the operation of a thicknesser/planer.
  • Handling of materials and operation of thicknesser/planer by a worker.
  • Workers not provided with the required personal protective equipment and having not received instruction as to method by which to wear an article of PPE.
  • Training not provided to workers as to how to operate a thicknesser/planer in the performance of a task.
  • Housekeeping of a workplace not undertaken and/or no areas assigned for the storage of materials and plant.
  • Workers not advised of specific controls to be implemented to ensure compliance with Work Health and Safety Legislation, Codes of Practice and Standards.
  • Performance of tasks and activities undertaken in connection with the operation of a thicknesser/planer.
  • Failure to monitor the implementation of control measures.

How do you keep employees and clients current and up to date?

Simple each user be they an employee, contractor or client is assigned a unique username and password to access the controlled version for the operation and use of a thicknesser/planer jsa/swms online.

  • Each user can access and view the online swms/jsa from a web capable device e.g. mobile phone with their username and password.
  • Line management personnel can access and print the safe work method statement/job safety analysis and online jsa/swms forms.
  • Line management personnel can send an swms/jsa email notification to a principal contractor, pcbu's and workers advising as to the details of the workplace, principal contractor, commencement and completion dates, person with management or control and any specific controls to be implemented when using a thicknesser/planer.
  • Users are notified of an amendment to the job safety analysis/work method statement via the online ohs diary and email notification.

What we will do to get you online

As a WHS online safe work method statement or job safety analysis subscriber WHS shall:

  • Create a group user account for your business and assign the user access required by you and your employees.
  • Insert your company logo and business details throughout the online safe work method statement, swms or jsa for the purpose of work health and safety compliance.
  • Notify you if the work method statement or job safety analysis or it's safe operating procedures or methods are amended.

Ordering is simple

  1. Add the safe work method statement, job safety analysis or safe operating procedure and any additional swms's, jsa's or sop's you require to the shopping cart.

  2. Follow the checkout process, ensuring you attach your company logo in a high resolution JPEG format for inclusion in the online safe work method statement/job safety analysis.

  3. Complete your order and payment process. A Tax Invoice will be forwarded to the email address you provide.

What happens next?

Upon receipt of payment notification WHS shall:

  • Send you an email requesting any additional information we may require to create your group registration.
  • Within 2 hours, customise your online safe work method statement/job safety analysis to incorporate your company logo and relevant business details, and create the required subscriber user access and email details of usernames and passwords to you. Where our workload is excessive we reserve the right to extend this time frame to 24 hours.

100% Money back guarantee!!

If you find a more comprehensive online safe work method statement, job safety analysis, safe operating procedure, SWMS, JSA or SOP accessible online, able to be printed and offers an email notification service from any web capable device, and you provide evidence of such we will refund your purchase.

pixel
 Associated swms's/jsa's  

Shoppers who bought the thicknesser/planer safe work method statement/job safety analysis also purchased.


Return to electric tools

Return to tools

Return to SWMS's/JSA's

pixel
pixel


pixel
pixel
  Login  |  Site Credits