 | Screw gun safe work method statement/job safety analysis |  | What is a screw gun? A screw gun is a handheld electrically operated tool used to install plasterboard wall and ceiling sheeting to a supporting framework. - Screw guns are similar to a normal drill except they are fitted with a nose that holds an interchangeable 6 mm shank bit.
- To engage the clutch and drive the screws, pressure must be applied to the shank bit;
- The nose of a screw gun can be adjusted for the purpose of countersinking screws to a desired or specified depth.
- Screws can be either manually placed on the shank bit or screws can be feed to the shank bit from an auto-feed clip.
Uses Screw guns may be used in the performance of a work task to:- Fix plasterboard or drywall sheeting to a stud or batten;
- Fixing of decking floor boards.
Tasks Tasks associated with the operation of a screw gun would include: - Pre-operational inspection of screw gun to ensure plant is in good order, electrically safe and all guards, handles and safety mechanisms are fitted and operational;
- Inspection of electrical cable to determine whether the cable and plug is in good order or needs replacing;
- Connection of electrical lead to an approved safety switch. Testing of safety switch;
- Inspection of shank bit to determine whether a shank bit is in good order or needs replacing;
- Fit and secure a shank bit correctly to a screw gun;
- Removal and fitting of handles to the body of the screw gun;
- Safe operation of screw gun in the performance of a specific task;
- Specific controls to be implemented when using a screw gun in the performance of a task;
- Hazardous manual tasks and ergonomic issues associated with the tightening of fixings and operation of a screw gun;
- Working at heights when operating a screw gun;
- Selection of personal protective equipment (PPE);
- Conduct a hazard identification of the task being performed;
- Compliance with specific controls as per a work health and safety regulation, code of practice, standard;
- Assess risk to workers undertaking the drilling of materials using a screw gun.
Online SWMS/JSA safe work method statement subscription service WHS compliance has never been easier with your safe work method statement or job safety analysis prepared by ex WHS Qld Government Workplace Health and Safety Inspectorate in consultation with Industry OHS Representatives to comply with Work Health and Safety Legislation, Codes of Practice, Industry Standards and Australian Standards. As a subscriber to a WHS online safe work method statement SWMS or job safety analysis JSA you and your employees can: - Access and view the work method statement, swms or jsa real time from any web capable device e.g. mobile phone, tablet, laptop, etc (for best results we recommend using the web browser Safari); and
- Print the safe work method statement, swms or jsa sign off sheet and approval form including change management approval in a pdf format or hard-copy via the print option; and
- Email the safe work method statement, swms or jsa notification advising a principal contractor, PCBU's and workers as to any specific controls to be implemented at a workplace for which the swms or jsa relates to; and
- Never worry again about amendments, updates and versions; and
- WHS maintain one controlled version of the safe work method statement or job safety analysis online as part of our continual improvement process; and
- That means there can be no confusion as you and your employees are all using the same safe work method statement, swms or jsa at the same time, leaving you to concentrate on your business.
How do you access and implement the safe work method statement or job safety analysis? To get you online, working, implementing and demonstrating safety compliance management, it's as easy as: - Log in via a mobile phone using your username and password;
- Complete and email the safe work method statement, swms or jsa notification with user access to a principal contractor, PCBU's and workers for a specific workplace; and
- That's it unless you need to print the sign off sheet, hazard and risk controls or change management approval form.
|  |  | 1 Year access - Online and print |  |
|
 | Example Safe work method statement / job safety analysis for using a screw gun |  | The sample safe work method statement is an extract of the first two identified health and safety hazards for the operation and use of a screw gun. - The business logo and administrative details you provide at time of purchase shall replace those that you see in the sample safe work method statement/job safety analysis.
 | Using a screw gun safe work method statement |  |  | Hazard |  | |  | Risk/outcome |  | |  | Control measures |  | |  | Implementation of controls |  | | Consultation not undertaken with workers as to the operation and use of a screw gun. | Workers shall be exposed to risk of death or serious injury where the operation or use of a screw gun is performed or undertaken incorrectly. Sustainable injuries would include but not be limited to: - First aid medical treatment for cuts and abrasions;
- Skin penetrating injuries;
- Musculoskeletal injuries;
Damage to plant.
| The operation and use of a screw gun shall be undertaken in accordance with any manufacturers instruction and any instructions provided by Electrical Plumbing Group . | Electrical Plumbing Group has a duty to ensure the health and safety of themselves, workers and other persons.
- Workers operating a screw gun shall be provided information, instruction, training and supervision as to the correct method by which a screw gun shall be operated or used in the performance of a task
Consultation Consultation shall occur between line management, workers and health and safety representatives as to the safe method of operating and using a screw gun. The process of consultation shall assess the hazards generated from the operation of a screw gun and take into consideration: - Is the operation of a screw gun necessary;
- Could an alternative tool be used with less risk to the user;
- Selection of correct shank bit e.g. type, size, etc dependant upon fixing to be tensioned;
- Fitment of safety mechanisms to the screw gun e.g. deadman switch;
- Pre-operational inspection of the screw gun;
- Environmental hazards and risks to workers;
- Are workers at risk of serious injury when operating or using a screw gun;
- Working at heights, prevention of tools and materials falling;
- Hazardous manual tasks associated with the operation of a screw gun.
Electrical Plumbing Group shall make a prepared for the operation and use of a screw gun available for perusal by workers. Residual risk Following the implementation of controls the risk should reduce to: |  | Hazard |  | |  | Risk/outcome |  | |  | Control measures |  | |  | Implementation of controls |  | | Introduction of hazards generated from the operation of a screw gun as a result of implementing proposed control measures. | Workers shall be exposed to risk of death or serious injury where hazards are created as a result of implementing proposed control measures. Sustainable injuries would include but not be limited to: - First aid medical treatment for cuts and abrasions;
- Musculoskeletal injuries;
- Skin penetrating injuries;
Damage to plant. | Control measures as per the hierarchy of controls shall be developed and implemented where additional hazards are generated from the operation of a screw gun.
| Electrical Plumbing Group shall ensure hazards generated as a result of operating a screw gun are identified with the hazard controlled. Control measures To prevent risk of death or serious injury to workers and other persons, the person with management or control of the works shall ensure: - The risk of death or serious injury resulting due to the conduct of the task is assessed to determine a persons exposure;
- Control measures to eliminate or minimise the risk of death or serious injury to persons shall be developed in consultation with workers;
- Control measures as per the hierarchy of controls shall be implemented to prevent, or minimise a persons level of exposure to risk of death or serious injury;
- Workers undertaking the performance of a task requiring the operation of a screw gun shall be trained as to any new control/s to be implemented and informed as to the hazard notification process should additional hazards be identified.
Residual risk Following the implementation of controls the risk should reduce to: |
 | Additional hazards and risks with operating and using a screw gun |  | Additional hazards and risks identified with the operation and use of a screw gun for which control measures have been developed as per the risk identification process include: - Working with faulty, defective or non-compliant plant.
- Incompatible shank bit used with a screw gun.
- Guards not fitted or installed to a screw gun.
- Alteration or modification of screw gun.
- Operation of screw gun without conducting a pre-operational inspection.
- Operation of screw gun in performance of a work task.
- Working at height whilst operating a screw gun.
- Hazardous chemicals and products associated with the operation of a screw gun.
- Handling and operation of a screw gun for the purpose of securing mechanical fixings.
- Workers not provided with the required personal protective equipment and having not received instruction as to method by which to wear an article of PPE.
- Training not provided to workers as to how to operate a screw gun in the performance of a task.
- Housekeeping of a workplace not undertaken and/or no areas assigned for the storage of materials and plant.
- Workers not advised of specific controls to be implemented to ensure compliance with Work Health and Safety Legislation, Codes of Practice and Standards.
- Performance of tasks and activities undertaken in connection with the operation of a screw gun.
- Failure to monitor the implementation of control measures.
How do you keep employees and clients current and up to date? Simple each user be they an employee, contractor or client is assigned a unique username and password to access the controlled version for the operation and use of a screw gun jsa/swms online. - Each user can access and view the online swms/jsa from a web capable device e.g. mobile phone with their username and password.
- Line management personnel can access and print the safe work method statement/job safety analysis and online jsa/swms forms.
- Line management personnel can send an swms/jsa email notification to a principal contractor, pcbu's and workers advising as to the details of the workplace, principal contractor, commencement and completion dates, person with management or control and any specific controls to be implemented when using a screw gun.
- Users are notified of an amendment to the job safety analysis/work method statement via the online ohs diary and email notification.
What we will do to get you online As a WHS online safe work method statement or job safety analysis subscriber WHS shall: - Create a group user account for your business and assign the user access required by you and your employees.
- Insert your company logo and business details throughout the online safe work method statement, swms or jsa for the purpose of work health and safety compliance.
- Notify you if the work method statement or job safety analysis or it's safe operating procedures or methods are amended.
Ordering is simple - Add the safe work method statement, job safety analysis or safe operating procedure and any additional swms's, jsa's or sop's you require to the shopping cart.
- Follow the checkout process, ensuring you attach your company logo in a high resolution JPEG format for inclusion in the online safe work method statement/job safety analysis.
- Complete your order and payment process. A Tax Invoice will be forwarded to the email address you provide.
What happens next? Upon receipt of payment notification WHS shall: - Send you an email requesting any additional information we may require to create your group registration.
- Within 2 hours, customise your online safe work method statement/job safety analysis to incorporate your company logo and relevant business details, and create the required subscriber user access and email details of usernames and passwords to you. Where our workload is excessive we reserve the right to extend this time frame to 24 hours.
100% Money back guarantee!! If you find a more comprehensive online safe work method statement, job safety analysis, safe operating procedure, SWMS, JSA or SOP accessible online, able to be printed and offers an email notification service from any web capable device, and you provide evidence of such we will refund your purchase. |  |  | Associated swms's/jsa's |  | Shoppers who bought the screw gun safe work method statement/job safety analysis also purchased.
Return to electric tools Return to tools Return to SWMS's/JSA's |  

|  |
| |