Erection of cable tray/ladder system

Cable trays are erected for the purpose of carrying and supporting electrical cables between a power source and an article or item of electrical equipment.

  • Cable trays can be installed in a vertical or horizontal application.
  • A support for a cable tray should be capable of supporting the load.

Tasks

Tasks associated with the erection and installation of a cable tray/ladder system include:

  • Job preparation and planning prior to erection and installation of cable tray;
  • Cutting of materials used in the erection of a cable tray;
  • Erection and fixing of a cable tray/ladder system;
  • Operation of power operated plant for cutting of cable tray materials;
  • Drilling of materials to support cable tray/ladder;
  • Installation of hangers to support cable tray;
  • Fixing of cable tray materials in the erection of a cable tray/ladder;
  • Working at heights when erecting cable tray;
  • Manual handling and ergonomic issues associated with the handling and cutting of cable tray materials;
  • Personal protective equipment required to be worn and/or used when handling and cutting cable tray materials;
  • Housekeeping of a workplace and work area;
  • Monitoring of control measures in the performance of the work task.

pixelpixel
Safety procedure includes

Erection of cable tray safe work method statement

Erection of cable tray safe work method statement is a 15 page document compliant with statute OHS reporting requirements. It identifies known hazards and risks, and outlines the control measures to be implemented to eliminate or minimise the risk of death, injury or illness as a result of undertaking the erection and fixing of a cable tray/ladder.
more


$125.00
inc GST

Control measures

Control measures to eliminate or minimise the risk of death, injury or illness to persons are addressed in the safe work method statement as per the following sections.

  • Consultation with employees.
  • Generation of hazards.
  • Erection of cable tray without having been involved in the planning process.
  • Cutting of materials used in the erection of a cable tray.
  • Erection and fixing of a cable tray/ladder system.
  • Work at heights whilst erecting a cable tray.
  • Manual handling issues.
  • Personal protective equipment requirements.
  • Training requirements.
  • Housekeeping requirements.
  • Failure to monitor controls.
  • Risk matrix and descriptors.
  • Additional hazards, risks and controls.
  • Approval and change management form.
  • Sign-off for erection of cable tray/ladder system.