pixel
pixelpixelpixel
pixelHome pagepixelpixelAbout uspixelpixelFAQpixelpixelContact uspixelpixelFollow workhealthsafe on Twitterpixelpixelpixelpixelpixel
pixel pixelpixel
pixel
pixel

Safe work method statement - Electrical - Clean and glue PVC conduits

1 of 13

Cleaning and gluing of electrical conduits

Electrical conduits are primarily used to carry electrical cables between a power source and an appliance.

  • Following the cutting of a PVC conduit it is necessary to clean the conduit prior to priming and gluing the conduit and associated fittings.

Tasks

Tasks associated with the cleaning and gluing of PVC electrical conduits include:

  • Handling of priming fluid and solvent cement in the jointing of PVC conduits;
  • Cleaning and jointing of PVC conduits;
  • Decanting of priming fluid and solvent cement to a secondary container;
  • Manual handling and ergonomic issues associated with the handling and decanting of a hazardous substance;
  • Personal protective equipment required to be worn and/or used when handling hazardous substances, cleaning and gluing of PVC electrical conduits;
  • Housekeeping of a workplace and work area;
  • Monitoring of control measures in the performance of the work task.

pixelpixel
Safety procedure includes

Clean and glue PVC conduits safe work method statement

Clean and glue PVC conduits safe work method statement is a 13 page document compliant with statute OHS reporting requirements. It identifies known hazards and risks, and outlines the control measures to be implemented to eliminate or minimise the risk of death, injury or illness as a result of cleaning and gluing PVC conduits.
more


$125.00
inc GST

Control measures

Control measures to eliminate or minimise the risk of death, injury or illness to persons are addressed in the safe work method statement as per the following sections.

  • Consultation with employees.
  • Generation of hazards.
  • Handling of priming fluid and solvent cement in the jointing of conduits.
  • Cleaning and jointing of PVC conduits.
  • Decanting of priming fluid and solvent cement to a secondary container.
  • Manual handling issues.
  • Personal protective equipment requirements.
  • Training requirements.
  • Housekeeping requirements.
  • Failure to monitor controls.
  • Risk matrix and descriptors.
  • Additional hazards, risks and controls.
  • Approval and change management form.
  • Sign-off for cleaning and gluing of electrical conduits.

Return to electrical works

Return to safe work method statements

pixel
pixel

Mini Cart

Click the checkout button to continue
pixel


pixel
pixel
  Login  |  Site Credits