pixel
pixelpixelpixel
pixelHome pagepixelpixelAbout uspixelpixelFAQpixelpixelContact uspixelpixelFollow workhealthsafe on Twitterpixelpixelpixelpixelpixel
pixel pixelpixel
pixel
pixel

Safe work method statements - Demolition

Workplace health and safety have developed a range of approved safe work method statements for the performance of high-risk activities and other work tasks associated with the undertaking of demolition work.

Click on the links below to take you to prepared work method statements.

Tasks

Disconnection of services

Footpath and road closures

Preparation of building

Manual demolition

Removal of concrete floor system

Removal of fixtures and fittings

Removal of glazing products

Removal of hazardous materials

Removal of lifts and plant

Removal of masonry walls

Removal of roof sheeting

Removal of roof tiles

Removal of timber floor systems

Removal of structural members

Removal of wall cladding

Mechanical demolition

Demolition of columns

Demolition of floors

Demolition of walls

pixelpixel
Plant

Backhoe

Drott

Excavator

Skid steer loader

Cranes

Elevated work platform

Forklift truck

Manitou

Scissor lift

Related

Asbestos removal

Electrical works

Excavation works

Scaffolding

Site establishment

Other

General issues

Heavy vehicles

Motor vehicle

Site establishment

Working at heights

pixelpixel
Tools

Angle grinder

Circular saw

Cordless drill

Drop saw

Electric drill

Electrical extension lead

Impact wrench

Jackhammer

Jigsaw

Rotary hammer drill

Sabre saw

Other tools

Chainsaw

** Page link error: Page with code SWMS_Tools_Petrol_Quickcut_Saw does not exist **

Air gun

Air tools

Compressor

Jackhammer

Arc welder

Oxy acetylene equipment

How do I access a safe work method statement

Safe work method statements are emailed to you in a ready to use or print pdf format, and can be implemented with ease by employers at construction workplaces.
  • Work method statements are individualised to contain your organisations name, date of issue and date when document is to be reviewed.
Implementing the safe work method statement

Complete your company details, site specific details of the workplace and principal contractor, sign and date.

  • Consult with employees as to the content of the safe work method statement, and the means by which the task is to be performed.
  • Have employees read the safe work method statement, sign and date the sign off form for the task or activity.
  • Submit a copy of the signed safe work method statement, sign off registers completed by employees and any copies of the additional hazards, risks and controls form, and approval and change management form where applicable.

I can't find the work method statement I'm after

If you find that we don't have the safe work method statement you require, don't hesitate to contact us and we will be only to happy to prepare it for you.


Return to safe work method statements


pixel
pixel



pixel
pixel
  Login  |  Site Credits