Safe work method statement - Carpentry - Cut and fix fibre cement sheeting

1 of 25

Cutting and fixing of fibre cement sheeting

Fibre cement sheeting when fixed to the external wall framing of a building or structure provides protection from the elements.

  • Fibre cement sheeting materials are cut to a specific length and shape, and fixed to a framework in a progressive manner.

Tasks

Tasks associated with the cutting and fixing of fibre cement sheeting include:

  • Planning and preparation for the cutting and fixing of fibre cement sheeting;
  • Measuring and cutting fibre cement sheeting with a score and snap knife, hand guillotine, fibreshear's, circular saw fitted with HEPA vacuum extraction and wet saw;
  • Pre-operational inspection of plant used to cut fibre cement sheeting;
  • Selection of correct cutting blade for plant to cut fibre cement sheeting;
  • Operation of plant for the cutting of fibre cement sheeting;
  • Securing and fixing of fibre cement sheeting;
  • Working at heights when erecting, positioning and fixing fibre cement sheeting;
  • Ergonomic issues with handling and erection of fibre cement sheeting;
  • Selection and use of personal protective equipment;
  • Compliance with specific controls as per a regulation, code of practice;
  • Assess the risk to workers cutting and fixing FC sheeting.

pixelpixel
Safety procedure includes

Fibre cement cladding
1-5 users - 12 mths online access

1 Year online and print access to Fibre cement cladding SWMS/JSA - 5 persons @ $25.00 per user.
more


$125.00
inc GST

Control measures

Control measures to eliminate or minimise the risk of death, serious injury or illness to workers are addressed in the safe work method statement as per the following sections.

  • Consultation with workers.
  • Generation of hazards.
  • Planning and preparation for cutting and fixing of fibre cement sheeting.
  • Measuring and marking fibre cement sheeting to be cut.
  • Use of score and snap knife to cut fibre cement sheeting.
  • Use of a hand guillotine to cut fibre cement sheeting.
  • Cutting of fibre cement sheeting with fibreshear's.
  • Cutting of fibre cement sheeting with a HEPA equipped circular saw.
  • Cutting of fibre cement sheeting with a wet circular saw.
  • Cutting silica based fibre cement sheeting with a wet circular saw.
  • Working with faulty or defective plant.
  • Selection and fitting of correct cutting blade.
  • Guards not fitted or installed to plant.
  • Alteration or modification of plant to cut fibre cement sheeting.
  • Positioning and fixing of fibre cement sheeting.
  • Working at heights requiring an EWP, fall arrest system, etc.
  • Controls when handling, decanting or using a hazardous chemical, substance or product.
  • Hazardous manual tasks.
  • Personal protective equipment requirements.
  • Training requirements.
  • Housekeeping requirements.
  • Compliance with specific controls imposed by a regulation or code of practice.
  • Failure to monitor controls.
  • Risk matrix and descriptors.
  • Additional hazards, risks and controls.
  • Approval and change management form.
  • Sign-off for carpentry services - Cutting and fixing of fibre cement sheeting.