pixel
pixelpixelpixel
pixelHome pagepixelpixelAbout uspixelpixelFAQpixelpixelContact uspixelpixelFollow workhealthsafe on Twitterpixelpixelpixelpixelpixel
pixel pixelpixel
pixel
pixel

 Arc welding safe work method statement or job safety analysis  

The sample arc welding safe work method statement / job safety analysis is an extract of the first two identified health and safety hazards associated with the operation and how to use arc welding equipment.

  • The business logo and administrative details you provide at time of purchase shall replace those that you see in the sample safe work method statement/job safety analysis.

Example arc welding safe work method statement / job safety analysis

pixel pixel

 Arc welding safe work method statement  

Set up and operation of arc welding equipment

Boilermakers when welding steel materials and the like typically undertake the set-up, operation and use of arc welding equipment.

Tasks

Tasks associated with the set up and operation of arc welding equipment for the welding of steel materials would include:

  • Conduct an inspection of environmental conditions to assess for the presence of explosive atmospheres, flammable materials, etc;
  • Conduct of pre-operational inspection of arc welding equipment e.g. welding leads, electrodes, etc;
  • Operation and use of arc welding equipment for the welding of steel materials;
  • Fire fighting when operating and using arc welding equipment;
  • Removal of slag from weld, and the cleaning of a weld;
  • Ergonomic issues with the set up and operation of arc welding equipment;
  • Selection of personal protective equipment (PPE);
  • How to conduct a hazard identification of the task being performed;
  • Compliance with specific controls as per a regulation, code of practice;
  • How to assess the risk to workers undertaking the set up and operation of arc welding equipment.
pixel
Person conducting a business or undertaking Electrical Plumbing Group
ABN:
96 147 385 ***
Address of person conducting a business or undertaking:
PO Box ****
Gumdale QLD 4154
Postal address of person conducting a business or undertaking:
PO Box ****
Gumdale QLD 4154
Phone number:
61-7 3823 ****
Fax number:
61-7 3375 ****
Contact person:
Scott *******
Mobile:
04** *** ***
Email:
****@epgi.com.au


 Hazard  
 Risk/outcome  
 Control measures  
 Implementation of controls  
Consultation not undertaken with workers as to the safe method of setting up and operation of arc-welding equipment.Workers shall be exposed to risk of death, serious injury or illness where the set up and operation of arc welding equipment is performed or undertaken incorrectly.

Sustainable injuries/illnesses would include but not be limited to:

  • First aid medical treatment for cuts and abrasions;
  • Electrocution;
  • Burns;
  • Falls from heights;
  • Musculoskeletal injuries;
  • Respiratory disease;
  • Facial injuries; and
  • Permanent disability.

Fire and explosion.

The set up and operation of arc welding equipment shall be undertaken in accordance with any manufacturers instruction and any instructions provided by Electrical Plumbing Group .Electrical Plumbing Group has a duty to ensure the health and safety of themselves, workers and other persons.
  • Workers undertaking the set up and operation of arc welding equipment, shall be provided information, instruction, training and supervision as to the correct method of setting up and operating the arc welding equipment.

Consultation

Consultation shall occur between line management, workers and health and safety representatives as to the safe method of setting up and operating arc welding equipment.

The process of consultation shall assess the hazards generated from the set up and operation of arc welding equipment and take into consideration:

  • Is the operation of arc welding equipment necessary;
  • Could an alternative tool be used with less risk to the user;
  • Environmental hazards and risks to workers e.g. confined space, combustible materials, atmospheric conditions, etc;
  • Set up and connection of arc welding equipment e.g. welding leads, electrode holders, etc;
  • Fitment of safety mechanisms to the arc welding equipment;
  • Pre-operational inspection of arc welding equipment;
  • Methods by which steel materials shall be welded, etc;
  • Selection of correct electrodes, amperage, etc;
  • Fire fighting equipment required when using arc welding equipment;
  • Mechanical ventilation for the extraction of fumes and gases;
  • Hazardous chemicals, substances and products used in the operation of arc welding equipment;
  • Are workers at risk of serious injury when setting up and operating arc welding equipment;
  • Working at heights, prevention of tools and materials falling;
  • Hazardous manual tasks associated with the set up and operation of arc welding equipment.

Electrical Plumbing Group shall make a prepared for the set up and operation of arc welding equipment available for perusal by workers.

Residual risk

Following the implementation of controls the risk should reduce to:

 Hazard  
 Risk/outcome  
 Control measures  
 Implementation of controls  
Introduction of hazards generated from the set up and operation of arc welding equipment as a result of implementing proposed control measures. Workers shall be exposed to risk of death, serious injury or illness where hazards are created as a result of implementing proposed control measures.

Sustainable injuries/illnesses would include but not be limited to:

  • First aid medical treatment for cuts and abrasions;
  • Electrocution;
  • Musculoskeletal injuries;
  • Burns;
  • Respiratory disease; and
  • Permanent disability.

Fire and explosion.

Control measures as per the hierarchy of controls shall be developed and implemented where additional hazards are generated from the set up and operation of arc welding equipment.
Electrical Plumbing Group shall ensure hazards generated as a result of setting up and operating arc welding equipment are identified with the hazard controlled.

Control measures

To prevent risk of death, serious injury or illness to workers and other persons, the person with management or control of the works shall ensure:

  • The risk of death, serious injury or illness resulting due to the conduct of the task is assessed to determine a persons exposure;
  • Control measures to eliminate or minimise the risk of death, serious injury or illness to persons shall be developed in consultation with workers;
  • Control measures as per the hierarchy of controls shall be implemented to prevent, or minimise a persons level of exposure to risk of death, serious injury or illness;
  • Workers undertaking the set up and operation of arc welding equipment shall be trained as to any new control/s to be implemented and informed as to the hazard notification process should additional hazards be identified.

Residual risk

Following the implementation of controls the risk should reduce to:

 Additional hazards and risks with arc welding  

Additional hazards and risks identified with the safe operation and use of arc welding equipment for which control measures have been developed as per the risk identification process include:

  • Workers undertaking the set up, operation and use of arc welding equipment without having been involved in the planning process.
  • Working with faulty, defective or non-compliant plant.
  • Alteration or modification of arc welding equipment.
  • Incompatible welding electrode used to arc weld steel materials.
  • Operation of arc welding equipment without conducting a pre-operational inspection.
  • Operation of arc welding equipment in performance of a work task.
  • Sparks, slag and molten metal generated from the operation of arc welding equipment.
  • Removal of slag following the completion of welding operations.
  • Working at a height when operating arc welding equipment.
  • Hazardous chemicals and products associated with the operation of arc welding equipment.
  • Handling, set up and operation of arc welding equipment for welding steel materials.
  • Workers not provided with the required personal protective equipment and having not received instruction as to method by which to wear an article of PPE.
  • Training not provided to workers for the set up and operation of arc welding equipment in the performance of a task.
  • Housekeeping of a workplace not undertaken and/or no areas assigned for the storage of materials and plant.
  • Workers not advised of specific controls to be implemented to ensure compliance with Work Health and Safety Legislation, Codes of Practice and Standards.
  • Performance of tasks and activities undertaken in connection with the operation and use of arc welding equipment.
  • Failure to monitor the implementation of control measures.

Online SWMS/JSA safe work method statement subscription service

WHS compliance has never been easier with your safe work method statement or job safety analysis prepared by ex WHS Qld Government Workplace Health and Safety Inspectorate in consultation with Industry OHS Representatives to comply with Work Health and Safety Legislation, Codes of Practice, Industry Standards and Australian Standards.

As a subscriber to a WHS online safe work method statement SWMS or job safety analysis JSA you and your employees can:

  • Access and view the work method statement, swms or jsa real time from any web capable device e.g. mobile phone, tablet, laptop, etc (for best results we recommend using the web browser Safari); and
  • Print the safe work method statement, swms or jsa sign off sheet and approval form including change management approval in a pdf format or hard-copy via the print option; and
  • Email the safe work method statement, swms or jsa notification advising a principal contractor, PCBU's and workers as to any specific controls to be implemented at a workplace for which the swms or jsa relates to; and
  • Never worry again about amendments, updates and versions; and
  • WHS maintain one controlled version of the safe work method statement or job safety analysis online as part of our continual improvement process; and
  • That means there can be no confusion as you and your employees are all using the same safe work method statement, swms or jsa at the same time, leaving you to concentrate on your business.

How do you access and implement the safe work method statement or job safety analysis?

To get you online, working, implementing and demonstrating safety compliance management, it's as easy as:

  • Log in via a mobile phone using your username and password;
  • Complete and email the safe work method statement, swms or jsa notification with user access to a principal contractor, PCBU's and workers for a specific workplace; and
  • That's it unless you need to print the sign off sheet, hazard and risk controls or change management approval form.

How do you keep employees and clients current and up to date?

Simple each user be they an employee, contractor or client is assigned a unique username and password to access the controlled version of the arc welding jsa/swms online.

  • Each user can access and view the online swms/jsa from a web capable device e.g. mobile phone with their username and password.
  • Line management personnel can access and print the safe work method statement/job safety analysis and online jsa/swms forms.
  • Line management personnel can send an swms/jsa email notification to a principal contractor, pcbu's and workers advising as to the details of the workplace, principal contractor, commencement and completion dates, person with management or control and any specific controls to be implemented for the safe operation and use of arc welding equipment.
  • Users are notified of an amendment to the job safety analysis/work method statement via the online ohs diary and email notification.

What we will do to get you online

As a WHS online safe work method statement or job safety analysis subscriber WHS shall:

  • Create a group user account for your business and assign the user access required by you and your employees.
  • Insert your company logo and business details throughout the online safe work method statement, swms or jsa for the purpose of work health and safety compliance.
  • Notify you if the work method statement or job safety analysis or it's safe operating procedures or methods are amended.

Ordering is simple

  1. Add the safe work method statement, job safety analysis or safe operating procedure and any additional swms's, jsa's or sop's you require to the shopping cart.

  2. Follow the checkout process, ensuring you attach your company logo in a high resolution JPEG format for inclusion in the online safe work method statement/job safety analysis.

  3. Complete your order and payment process. A Tax Invoice will be forwarded to the email address you provide.

What happens next?

Upon receipt of payment notification WHS shall:

  • Send you an email requesting any additional information we may require to create your group registration.
  • Within 2 hours, customise your online safe work method statement/job safety analysis to incorporate your company logo and relevant business details, and create the required subscriber user access and email details of usernames and passwords to you. Where our workload is excessive we reserve the right to extend this time frame to 24 hours.

100% Money back guarantee!!

If you find a more comprehensive online safe work method statement, job safety analysis, safe operating procedure, SWMS, JSA or SOP accessible online, able to be printed and offers an email notification service from any web capable device, and you provide evidence of such we will refund your purchase.

Associated swms's/jsa's

Shoppers buying this safe work method statement/job safety analysis also bought.

pixel
pixel
 Save up to 20% More  
pixel

1 Year online and print access to Operation of ARC welder SWMS/JSA - 5 persons @ $25.00 per user.

more

Total: $125.00 inc GST

Mini Cart

Click the checkout button to continue
pixel


Return to welding equipment

Return to tools

Return to SWMS's/JSA's

pixel
pixel


pixel
pixel
  Login  |  Site Credits